YMonitor

YMonitor Project Tracker: Image report of the Ojota second pedestrian bridge

by Usman Alabi

Below are the images of the ongoing second pedestrian bridge at Ojota.

1

The above is the metal stair way of the bride on the verge of being affixed to the main bridge.

This is the second stairway already affixed.

Let us have your take on this project. You can leave your comment below or send us an email on contact@ymonitor.org. We want to hear from you.

Exit mobile version