Ajadi Daniel
Below is the progress image of the ongoing road and pedestrian bridge construction at berger bus-stop.
The above pictures are that of the extended overhead bridge which is still under construction.
The images above are that of the stairway to the second pedestrian bridge at berger.
The project is still ongoing and nearing completion. Let us have your take on this project.