28 November 2016YMonitor Project Tracker: Image report of the Ojota second pedestrian bridgeby Usman Alabi Below are the images of the ongoing second pedestrian bridge at Ojota. The above is the metal stair way of the bride on […]
25 November 2016YMonitor Project Tracker: Status Images of the ongoing construction of lay-by and slip road at Berger bus-stopby Usman Alabi The Lay-by, slip road under construction at Berger bus-top is meant to reduce traffic on the main road for those leaving Lagos and […]